Name the methods of material requirements planning and give a short description.
Deterministic
Exact calculation based on orders and sales program
Time and cost intensive
Stochastic
Forecast of the demand based on historic values
Heuristic
Estimate of the demand
Depends on experience
Exact calculation based on orders and sales program
Time and cost intensive
Stochastic
Forecast of the demand based on historic values
Heuristic
Estimate of the demand
Depends on experience
Tags: MRP
Quelle:
Quelle:
Describe the procedures of the Consumption-Based Planning
x Reorder Point Planning (manual/automatic)
x Forecast-Based Planning
x Time-Phased Planning
x Forecast-Based Planning
x Time-Phased Planning
Tags: MRP
Quelle:
Quelle:
Name the different types of Lot-Sizing procedures in SAP.
Static Lot-Sizing
x Lot-for-lot quantity
x Fixed lot size
x Replenishment (Auffüllung) to the maximum stock level
Period lot-sizing procedures
Groups several requirements within a time interval together
Optimum lot-sizing procedures
Costs (setup or order and storage) are minimzed
x Lot-for-lot quantity
x Fixed lot size
x Replenishment (Auffüllung) to the maximum stock level
Period lot-sizing procedures
Groups several requirements within a time interval together
Optimum lot-sizing procedures
Costs (setup or order and storage) are minimzed
Tags: MRP
Quelle:
Quelle:
Describe the various methods of scheduling and their usage depending on the material planning procedures in SAP
Forward scheduling
Used with manual reorder point planning
Backward scheduling
Used with forecast based planning
Used with manual reorder point planning
Backward scheduling
Used with forecast based planning
Tags: MRP
Quelle:
Quelle:
Name the times which influence the total time for procurement and give a short description.
x Processing time for purchasing
x Planned delivery time
x Good receipt processing time
x Planned delivery time
x Good receipt processing time
Tags: MRP
Quelle:
Quelle:
Kartensatzinfo:
Autor: Denyo
Oberthema: SAP
Thema: Fragenkatalog
Schule / Uni: FH Aachen
Ort: Aachen
Veröffentlicht: 01.09.2009
Schlagwörter Karten:
Alle Karten (40)
ASAP (5)
Auth System (3)
BOM (4)
Material Master (5)
MRP (5)
SOP (4)