CoboCards App FAQ & Wünsche Feedback
Sprache: Deutsch Sprache
Kostenlos registrieren  Login

Hol' Dir diese Lernkarten, lerne & bestehe Prüfungen. Kostenlos! Auch auf iPhone/Android!

E-Mail eingeben: und Kartensatz kostenlos importieren.  
Und Los!
Alle Oberthemen / SAP / Fragenkatalog

SAP (40 Karten)

Sag Danke
1
Kartenlink
0
How do you calculate the operational time of a capacity from standard availability?
From the specification on...

x Start of work and end of work of a shift
x Duration of breaks
x Utilization rate of the capacity
x From the number of the individual capacities the capacity consists of

...the system calculates the operational time as well as the daily available capacity at a work center in the chosen basic quantity unit.
Tags: Work Centers and Routings
Quelle:
2
Kartenlink
0
Which purpose are "availability intervals" maintained for?
In the case of a deviation from the standard availability you may specify temporally, variable, available capacity with any units of quantity and availability intervals of different versions.
For these temporally limited available capacities you can specify availability intervals.
By maintaining the validity of the availability interval the present availability intervals will be erased or limited.
Tags: Work centers and Routings
Quelle:
3
Kartenlink
0
What is the difference between standard routing and reference operation set?
A standard routing defines the process sequence for the production of a material. In contrast to reference operation sets, standard routings are assigned to a material.

A reference operation set simplifies the maintenance efforts by describing frequently repeated operations of a manufacturing process.
In the form of a reference or a template, the reference operation set is integrated into the standard routing as a part of it.
Tags: Work centers and Routings
Quelle:
Kartensatzinfo:
Autor: Denyo
Oberthema: SAP
Thema: Fragenkatalog
Schule / Uni: FH Aachen
Ort: Aachen
Veröffentlicht: 01.09.2009
Tags: Grap Trautwein englisch 2009 SAP POM
 
Schlagwörter Karten:
Alle Karten (40)
ASAP (5)
Auth System (3)
BOM (4)
Capacity Planning (6)
Material Master (5)
MRP (5)
Purchase Order Processing (5)
SOP (4)
Work Centers and Routings (1)
Work centers and Routings (2)
Missbrauch melden

Abbrechen
E-Mail

Passwort

Login    

Passwort vergessen?
Deutsch  English