CoboCards App FAQ & Wishes Feedback
Language: English Language
Sign up for free  Login

This flashcard is just one of a free flashcard set. See all flashcards!

All main topics / Education / Education / Education
1942
The project is determined in consultation with the onsite
Just Click on Below Link To Download This Course:

https://www.devrycourses.com/product/devry-him-460-week-7-managerial-project-latest/

PAPER GUIDELINES
A paper describing your managerial project is due in Week 7 (60 points). The project is determined in consultation with the onsite practicum director, this a required assignment for the course. All students will design a project that will be from the HIM management perspective that specifically meets one or more of the course COs and benefits the practicum site (see the topic examples shown below). This paper should include pertinent details about the project, how the project relates to 1-2 of the COs for this course and what were the outcomes or improvements made through the project. A summary of this information should be incorporated into the Oral Presentation also due in Week 7.
Tags: DEVRY HIM 460 WEEK 7, DEVRY HIM 460 WEEK 7 MANAGERIAL PROJECT LATEST
Source: https://www.devrycourses.com/product/devry-him-460-week-7-managerial-project-latest/
New comment
Flashcard info:
Author: CoboCards-User
Main topic: Education
Topic: Education
School / Univ.: devry university
City: UK
Published: 12.02.2020

Cancel
Email

Password

Login    

Forgot password?
Deutsch  English